Chris Pritchett – Architect

We are committed to providing exceptional service with an emphasis on meeting the budget, satisfying the client’s requirements while leaving an environmentally sound legacy to the future. The practice aims to add design value to all stages of a project and to build long-term relationships with clients. This practice acknowledges the important relationship between building users and the natural environment and employs ecologically sustainable design skills to deliver projects that benefit our clients and future generations by enhancing the quality and sustainability of the natural and built environment.
Driving directions to Chris Pritchett – Architect on map
Chris Pritchett – Architect on Google Maps
Projects:




Denham House
Marlborough, 2002
This interesting project was located on a difficult site that presented quite a few challenges. The average slope was 37 degrees, posing some engineering challenges, handled superbly by the in-house engineering team at Smart Associates. The house was therefore limited in plan depthwise but was designed to have longer thinner areas – stacked on five levels – maximising the magnificent views to the Marlborough Sounds. The top level incorporated a tower accommodating a spa bath with breathtaking




SSDU Office Fitout
Coopers Plains, Brisbane, 2008
Office fitout for Queensland Health SSDU (Scientific Skills Development Unit). This project required the re-instatement of two walls, the provision of a small kitchenette, re-configuration of existing workstations and design of joinery items. A meeting room with audio-visual equipment was included in the project as well as a computer training suite with an interactive ‘Smartboard’.




Performing Arts Building Extension
Wellington Point State High School, 2010
Internal renovations of an existing building to provide an enhanced stage area and proscenium arch and the addition of a dance studio / teaching space. Provision of new facilities to make building accessible to the general public for performances and upgrade of front entry.